Documents › c93848aa2bbdb41ec3ce59408815573609c88ef7:223-239

Folsom Fire Department NFIRS Report F24140131

Agency records police reportcriminal case 2024-07-25 Folsom Police Department 17 pages (file pages 223–239) original file
About this document
Layer
agency record: part of a file an agency produced
Type as titled
fire incident report (kind from doc_type)
Produced as
folsom-police-department/IA 24-004 Final Release.pdf
File
c93848aa2bbdb41ec3ce59408815573609c88ef7 application/pdf
Cases
agency:C-12b9c9bd93 · David Erler (concern)

About: David Erler (case)

Page 15 · file page 237 larger image
Image of page 15; its text is alongside
Text: OCR

NFIRS-1S Supplemental

A

34090CA0724202432 (32)F241401310
FDIDStateMonthDayYearStationNumberExposure

Apparatus Narrative for AC24:

AC24 arrived as part of the second alarm assignment. I assisted BC13 who was the IC with accountability and gathering information of the displaced occupants from both houses. Both parties were local law enforcement, so I spoke to other partners who would look into their well being and assist them as needed. Following knock down, searches, and during overhaul, AC24 was released and went AOR.

Apparatus Narrative for AR112:

AR112 responded code 3 for a report of a structure fire at [REDACTED] Ct. AR112 arrived and set up for SCBA filling, and Rehab. AR112 filled all scba's on scene of the incident. After the assignment was completed AR112 was released by command. AR112 went aor and returned to quarters.

Apparatus Narrative for ARSON24:

Arson24 was requested to respond to the scene. When Arson24 arrived an Origin and Cause investigation was conducted. Arson24 later completed an agency O/C report.

Apparatus Narrative for BC13:

Refer to incident commander narrative.

Apparatus Narrative for BC14:

BC14 responded as part of a greater alarm S3 assignment at the dispatched location. I arrived and met with the Incident Commander (BC13-J. Vestal) who assigned me to Division D at [REDACTED] Ct. E22, E31, E28, TR65, and HM109 were assigned to Division D at various times during the incident. It took several hose lines and multiple crew orations to complete knockdown the fire. When able to, crews performed salvage on the interior of the home to secure savable property. Once the fire was contained in Division D, crews transitioned to overhaul. When crews completed overhaul operations, they collected their equipment and went available. See the main narrative for additional details.

Apparatus Narrative for BC5:

BC5 arrived and was assigned to get a lap of the Bravo building - intel reported back to command and BC5 was released.

Apparatus Narrative for DEC110:

Decon 110 arrived on scene as part of an S3 response. Decon 110 provided man power, deployed the storm stick, provided water, and assisted with refilling air cylinders. Decon 110 assisted with clean up, and was released shortly after. Decon 110 AOR.

Page 15 of 17

Keys: ← → or j k turn pages; / finds.