Documents › 7f66e395837cac28f0dc322c0252403ff1a7e1c9:21-220

342 - 11.30.23_Transcript_Commission

POST board interview transcriptagency investigation 2024-03-07 200 pages (file pages 21–220) original file
About this document
Layer
packet: an item in a POST meeting packet
Type as titled
transcript (kind from title)
File
7f66e395837cac28f0dc322c0252403ff1a7e1c9 application/pdf
Cases
none: board business or reference material
Page 57 · file page 77 larger image
Image of page 57; its text is alongside
Text: digital text layer
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
POST Commission Meeting, November 30, 2023
KATHRYN S. SWANK, CSR, RPR    (916) 390-7731
57
and/or even -- not even completed.  So we have to 
address that with them.  
Learning activities are not being taught.  TTS 
references not included on the schedule, which is a 
requirement through 1059 now.  So in addition to the 
schedule, the RBC director and coordinator are 
responsible for breaking down the instructor, the date, 
and the TTS content that is instructed for the day.  
Requests for course numbers are sometimes requested 
after the course is actually started, which is a 
problem.  Because if they're in modification, they 
cannot access TMAS material to conduct tests for their 
students.  So then we get an emergency call, "We can't 
access it."  And we'll notice that they're in 
modification, and that's the reason for the limiting 
factor of them accessing that TMAS for testing.  
One of the biggest problems we've seen is that RTOs 
and/or directors are sometimes acting in dual 
capacities.  They're working as the instructor and also 
working as the recruit training officer.  So those two 
things are independent, and you can't have an RTO act as 
an RTO and teaching at the same time.  
The purpose of RTOs being on-site is that if 
there's an issue that needs to be addressed, the lead 
instructor is not stepping away and handling that issue 