Documents › 525c04436c2b7b9b901a8e9b4eb2e229b83399ff:15-264
449 - 2024 09-12 POST Commission Transcript.pdf
About this document
- Layer
- packet: an item in a POST meeting packet
- Type as titled
- transcript (kind from title)
- File
- 525c04436c2b7b9b901a8e9b4eb2e229b83399ff application/pdf
- Cases
- none: board business or reference material
Page 204 · file page 218
larger image
Text: digital text layer
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
POST Commission Meeting - 9/12/24
MR. GEROLAGA: Erik Gerolaga.
They will still have the 90 days after the cycle is
complete to input anything that they might need to,
again, mitigate during that time. So once we finally --
like I said, from 2025 to 2026, they will still have
from January 1st all the way to March 31st to be able
to, again, provide the mitigation, if needed.
COMMISSIONER THERRIAULT: Thank you.
MR. CHALK: Tom Chalk, POST again.
Chair Long, when you referenced guidelines, is this
more of a time -- like a time limit, or what -- somebody
has to be out of work for a certain period of time?
CHAIRPERSON LONG: Yeah, it has to be somewhere
along those lines.
I mean, my preference would be -- and, of course, I
would defer to the sheriffs and chiefs who have to run
these things would be to get some type of more
definitional guardrails and bring it back in November.
It might be my druthers.
But, yeah, along those lines. Something.
COMMISSIONER GORDON: I will say -- Commissioner
Gordon -- to a point that's already been made, even for
a midsized agency, we're in the process of doing all of
our ARCON right now. Just the way of our training
schedule has played out over the last two years.
KATHRYN S. SWANK, CSR, RPR
(916) 390-7731
204
218
Keys: ← → or j k turn pages; / finds.